Founding Community — Build Tracker
8-week parallel build · portal + agent infrastructure · reviewed weekly
Master doc: zerogravity-community-portal-design.md · Last update: 30 Aug 2026 · portal
PRODUCTION · Weeks 1–6 + 8 done · Week 7 staged (awaiting LinkedIn CSV + Mike's GO)
WEEK 1Portal foundation + n8n setup
- New homepage: founding-member positioning (NL/EN), product messaging retired
- Portal shell with routing: feed, tracks, members, resources, news, leaderboard
- n8n CE install on Mac Mini (Mike's manual step 1)
DONE
WEEK 2Agent workflows: Karin + Han
- Karin bi-weekly research workflow (n8n export, sources mandatory)
- Knowledge + Builder chat agents with track system prompts
- SubFactory-first AI routing with Workers AI fallback
DONE
WEEK 3Annabelle pilot tracking + ticketing
- Annabelle agent: pilot scoping, ROI coaching, milestone structure
- Milestone points (+100) in gamification ledger
- Plane install + API hookup for Builder/Pilot tickets (needs Mac Mini)
DONE
WEEK 4Per-track chat interfaces on the portal
- Chat UI for all three tracks, conversation persistence
- Conversation → publish-summary loop with member consent (§4.2)
- Topic suggestions captured in-conversation, routed to Karin (§4.3)
DONE
WEEK 5Gamification + member profiles
- Points ledger, 5 badges, leaderboard, founding badge permanence
- Member directory with search, customisable profiles, DM entry point
DONE
WEEK 6Admin command center
- Growth metrics, engagement heatmap, agent status board
- Content calendar, moderation queue, KPI dashboard (behavioural only)
- Instruction panel → c_instructions → agents poll & execute
DONE
WEEK 7LinkedIn integration + Growth agent
- CSV → segment-by-role → personalised invite workflow (n8n export)
- Conversion path instrumented: source tag → track routing → welcome
- Awaiting: LinkedIn Connections.csv export + Mike's GO for cohort sends
STAGED
WEEK 8Testing & refinement → PRODUCTION
- IP guardrail: blocklist in D1, enforced on feed/chat/news, verified live (suite PASS)
- Production hardening: 15 review findings fixed (worker v2, live-first portal, live admin)
- E2E suite (test-production.sh) wired into every deploy — full member journey + guardrail + cleanup
- Monitoring: live admin dashboard (60s refresh) + scheduled Monday pulse
DONE
Site & Subfactory Ops
Running log after the 8-week build · dated entries, verified before they land here
2026-08-25Buzz — conversational front door to the agent layer
- Spike (23–24 Aug), verdict GO 5/5: two local agents + the founder in one self-hosted Buzz channel (Apache-2.0), agents referencing each other with clean turn-taking, zero runaway loops — on a local 32B model via Ollama, zero metered spend
- Pilot hardened 25 Aug: relay pinned to a tagged release with three carried patches, fresh keys outside any repo, managed services, private-network-only binding (verified: zero public exposure)
- First real agent "Atlas" answers @mentions in persona, allowlist-only; replies run 1–4 minutes on local inference — a knowable cost of the sovereign path
- Signed ops log caught a 20-day silent sync outage on day one — the "every event in one log" value prop proving itself immediately
- Observation week runs to 1 Sep: reboot-survival test, remote client join, and a clean acceptance re-run still open; upstream moves ~15 commits/day against our pinned tag
PILOT WEEK
2026-08-30Production redeploy from curated set
- July audit: a 12 Jul deploy had shipped the entire working directory (51 files incl. ops content) to production
- Site rebuilt and redeployed from a curated, term-scanned file set; client-side filter term list removed from public source
- Retired product pages (assess, dashboard) and outdated llms.txt replaced to match founding-community positioning
- Old preview deployments on *.pages.dev still pending deletion
DONE
2026-08-29/lab — WebGPU experiment staged
- Infinite-block illusion (MIT) built with subpath-correct assets: 120 files · 53 MB, verified locally
- Awaiting: installer run + deploy · post-deploy WebGPU/WebGL notes on Mac Mini and phone
STAGED
Blockers / Mike's only manual steps (§11.5): ① run the three commands in
zg-community/DEPLOY.md (D1 schema, ADMIN_TOKEN, deploy) · ② install n8n CE on the Mac Mini and
import the two workflows · ③ export LinkedIn connections CSV. Everything else operates autonomously.
[TO SET] before launch (§12): June KPI targets · ChromaDB index scope ·
Cycle-13 theme · anchor segment (recommendation: Builder first).